1[2 {3 "query": "PM-41861 passed refinement. what do I need to test?",4 "should_trigger": true5 },6 {7 "query": "I'm picking up QA for the item-types import/export work (PM-32009). work out what has to be tested from the ACs before devs finish so nothing in the story gets missed",8 "should_trigger": true9 },10 {11 "query": "for every acceptance criterion in the passkey enrollment epic, list the scenarios that would prove it works, including boundaries and invalid input"
15 "query": "the PO wants a test plan for CL-1221 before sign-off, showing the tests we'll need for each requirement. can you put that together?",
16 "should_trigger": true
17 },
18 {
19 "query": "the vault-unlock rework story says the PIN has to be 4 to 8 digits. what test cases does the story need overall, edge values included?",
20 "should_trigger": true
21 },
22 {
23 "query": "emergency-access revamp epic is ready. give me the test design for each child story and show where gaps in the requirements leave nothing to test against",
24 "should_trigger": true
25 },
26 {
27 "query": "what scenarios should QA cover for PM-42838 now that the design question got answered?",
28 "should_trigger": true
29 },
30 {
31 "query": "need a plan of what to test for the billing upgrade flow story, traced back to its acceptance criteria, so I can show coverage in refinement",
32 "should_trigger": true
33 },
34 {
35 "query": "derive test scenarios from the ACs on PM-41861 and tell me which ones belong pre-merge vs after the feature works",
36 "should_trigger": true
37 },
38 {
39 "query": "before dev starts on the org-vault export epic, figure out the full set of tests each story needs from what's written in the tickets",
40 "should_trigger": true
41 },
42 {
43 "query": "is PM-123 ready to build, or does it need more detail before we test it?",
44 "should_trigger": false
45 },
46 {
47 "query": "review the acceptance criteria on PM-456 for gaps and ambiguity",
48 "should_trigger": false
49 },
50 {
51 "query": "which layer should the new PM-789 tests go at, unit or component?",
52 "should_trigger": false
53 },
54 {
55 "query": "are unit tests enough for the PM-234 change, or do we need integration tests?",
56 "should_trigger": false
57 },
58 {
59 "query": "write manual Gherkin test cases for PM-345 that I can import into Testmo",
60 "should_trigger": false
61 },
62 {
63 "query": "write the Testmo test cases for the acceptance criteria on PM-567",
64 "should_trigger": false
65 },
66 {
67 "query": "break down PM-678 into a work plan with testing phases",
68 "should_trigger": false
69 },
70 {
71 "query": "create a work plan with verification tasks for the PM-890 epic",
72 "should_trigger": false
73 },
74 {
75 "query": "identify the requirements and clarify the ambiguities in PM-112",
76 "should_trigger": false
77 },
78 {
79 "query": "write a spec from this ticket, PM-223",
80 "should_trigger": false
81 },
82 {
83 "query": "write the Playwright tests for the acceptance criteria on PM-345",