Setting the skill. One moment.
Bitwarden Product Analyst
Skill 44 of 83
2 minutes · 549 words · 15 sections
Install
npx skills add bitwarden/ai-plugins --skill work-breakdownnpx skills add bitwarden/ai-plugins/plugin marketplace add bitwarden/ai-pluginsThe first command installs just this skill, by the name in its SKILL.md; the second installs the whole repository.
Organize work into logical phases:
Phase 1: Architecture & Design
Phase 2: Implementation
Phase 3: Testing
Phase 4: Documentation & Deployment
Each task should be:
Each task should follow this structure:
**Task X.Y**: [Concise task title]
- **Description**: [What needs to be done]
- **Team/Role**: [Backend | Frontend | Security | QA | DevOps]
- **Estimated Duration**: [2-8 hours]
- **Dependencies**: [Task IDs that must complete first, or "None"]
- **Deliverables**: [Specific outputs or changes]
- **Acceptance Criteria**: [How to verify completion]See examples/oauth-authentication.md for a complete worked example.
Organize work breakdown in structured phases:
# Work Breakdown: [Feature Name]
## Summary
- **Total Estimated Duration**: X-Y hours
- **Number of Tasks**: N tasks across M phases
- **Teams Involved**: [List of teams]
- **Critical Path**: [Key dependencies or bottlenecks]
---
## Phase 1: [Phase Name]
**Goal**: [What this phase accomplishes]
**Task 1.1**: [Task title]
- **Description**: [What needs to be done]
- **Team/Role**: [Who does this]
- **Estimated Duration**: [Hours]
- **Dependencies**: [Prerequisites or "None"]
- **Deliverables**: [Concrete outputs]
- **Acceptance Criteria**: [How to verify]
**Task 1.2**: [Next task]
...
---
## Phase 2: [Phase Name]
...
---
## Verification
After all phases complete, verify:
- [ ] All functional requirements implemented
- [ ] All non-functional requirements met
- [ ] All security requirements addressed
- [ ] All tests passing (unit, integration, E2E)
- [ ] Documentation complete and accurate
- [ ] Deployment procedures testedmain, last pushed 6 November 2026.SKILL.md, not by matching a directory convention. 20 distinct layouts observed: plugins/bitwarden-abacus-tools/skills/*/SKILL.md, plugins/bitwarden-adr-tools/skills/*/SKILL.md, plugins/bitwarden-atlassian-tools/skills/*/SKILL.md, plugins/bitwarden-code-review/skills/*/SKILL.md, plugins/bitwarden-delivery-tools/skills/*/SKILL.md, plugins/bitwarden-design-tools/skills/*/SKILL.md, plugins/bitwarden-designer/skills/*/SKILL.md, plugins/bitwarden-devops-engineer/skills/*/SKILL.md, plugins/bitwarden-doc-parity/skills/*/SKILL.md, plugins/bitwarden-mailcatcher-tools/skills/*/SKILL.md, plugins/bitwarden-product-analyst/skills/*/SKILL.md, plugins/bitwarden-retrospective-tools/skills/*/SKILL.md, plugins/bitwarden-security-engineer/skills/*/SKILL.md, plugins/bitwarden-shepherd/skills/*/SKILL.md, plugins/bitwarden-stripe-tools/skills/*/SKILL.md, plugins/bitwarden-tech-lead/skills/*/SKILL.md, plugins/bitwarden-testing-tools/skills/*/SKILL.md, plugins/bitwarden-testmo-tools/skills/*/SKILL.md, plugins/claude-config-validator/skills/*/SKILL.md, plugins/claude-retrospective/skills/*/SKILL.md.h1 and no skipped levels:.claude-plugin/marketplace.json by Bitwarden, declaring 23 plugins. It is read for editorial metadata only — never as the skill index, which is always the repository tree./bitwarden/ai-plugins.md, and each skill at its own .md URL.1 file · 9 KB
Everything this skill ships beside its prose. All of it is set here, as a subchapter of skill 44.
Everything else published alongside the skill.